Analysis of the Influence of Material Procurement Supply Chain Management on Project Time Performance
DOI:
https://doi.org/10.35313/potensi.v28i2.4403Abstract
Construction process often faces material-related issues. Materials really need special attention because the use of materials takes up 50% - 70% of the total cost of the whole project. Therefore, very good management is needed. Supply chain management is used to manage material procurement because it has a concept that is able to increase project success by producing products on time, reducing costs, and managing the industry effectively and efficiently. This study aims to find out the dominant factors that influence the implementation of material procurement supply chain management and the effect of material procurement supply chain management on construction project time performance. In this study three factors influenced the implementation of supply chain management of material procurement including financial flow, information flow, and material flow. This study uses a questionnaire as a data collection method, then analyzed with validity test, reliability test, classical assumption test, and verification test with the help of SPSS software. The results of this study indicate that the material flow (0.873) has a significant effect on the time performance of construction projects, and the biggest indicator is in the suitability of the material with technical specifications with a value of 4.14.
Downloads
References
[1] A. Maddeppungeng, I. Suryani, & O. K. Amarilis, “Pengaruh Rantai Pasok Terhadap Kinerja Kontraktor Di Provinsi Banten Dan DkI Jakarta,” Fondasi J. Tek. Sipil, vol. 9, no. 2, 2018, doi: https://doi.org/10.24853/jk.9.2.75-87.
[2] H. Susila & S. Handoyo, “Analisis Faktor Dominan Resiko Biaya Pada Pelaksanaan Proyek Konstruksi Gedung Di Surakarta,” J. Tek. Sipil dan Arsit., vol. 18, no. 22, pp. 1–15, 2016, [Online]. Available: http://ejournal.utp.ac.id/index.php/JTSA/article/view/366
[3] M. N. Sholeh & M. A. Wibowo, “Aplikasi Rantai Pasok: Pengadaan Material Konstruksi Antar Pulau,” Pros. Semin. Nas. Multidisiplin Ilmu Call Pap. UNISBANK, pp. 978–979, 2015.
[4] L. D. Trisnawati, G. A. P. C. Dharmayanti, and N. M. Jaya, “Analisis Kinerja Proyek Terhadap Kepuasan Stakeholder,” J. Spektran, vol. 6, no. 2, pp. 205–209, 2018, [Online]. Available: http:/ojs.unud.ac.id/index.php/jsn/index
[5] S. N. Anwar, “Manajemen Rantai Pasokan (Supply Chain Management): Konsep Dan Hakikat,” Dinamika Informatika, vol. 3, no. 2, 2011, doi: https://doi.org/10.35315/informatika.v3i2.1315.
[6] R. N. Alfian & S. Widiyanesti, “Pengaruh Green Inovation Pada Hubungan Antara Praktik Manajemen Rantai Pasok Hijau Dan Kinerja Lingkungan,” e-Proceeding Manag., vol. 8, no. 2, pp. 952–958, 2021, [Online]. Available: https://openlibrarypublications.telkomuniversity.ac.id/index.php/management/article/viewFile/14765/14542
[7] H. Rachmasari, “Analisa Risiko Rantai Pasok Konstruksi Dengan Menggunakan Model Simulasi,” 2019.
[8] C. Z. Oktaviani, “Upaya Peningkatan Efektivitas Dan Efisiensi Rantai Pasok Proyek Konstruksi Dengan Pengukuran Kinerja,” J. Civ. Eng., vol. 8, no. 2, pp. 73–79, 2019, doi: https://doi.org/10.37598/tameh.v8i2.78.
[9] F. M. Hasan, M. Afifuddin, & Abdullah, “Hubungan dan pengaruh faktor-faktor risiko rantai pasok material terhadap kinerja proyek pembangunan Gedung Di Kabupaten Pidie Jaya dan Bireuen,” J. Arsip Rekayasa Sipil dan Perenc., vol. 2, no. 4, pp. 362–371, 2019, doi: https://doi.org/10.24815/jarsp.v2i4.14953.
[10] R. O’Brien, William J., London, Kerry & Vrijhoef, “Construction Supply Chain Management: a Research Review and Agenda,” ICFAI J. Oper. Manag., vol. 3, no. 3, pp. 64–84, 2004, [Online]. Available: http://hdl.handle.net/10536/DRO/DU:30020890
[11] S. Soepiadhy, I. P. A. Wiguna, & S. P. Wulandari, “Pengaruh Supply Chain terhadap Kinerja Kontraktor Bangunan Gedung di Jember,” Pros. Semin. Nas. Apl. Teknol. Prasaran Wil., pp. 1–5, 2011.
[12] A. Maddeppungeng, “Pengaruh Manajemen Rantai Pasok (MRP) pada Daya Saing dan Kinerja Perusahaan Jasa Konstruksi di DKI-Jakarta,” Konstruksia, vol. 8, no. 2, pp. 23–36, 2017, doi: https://doi.org/10.24853/jk.8.2.23-36.
[13] I. Agsarini & I. P. A. W. Wiguna, “Pengaruh Faktor Kondisi Proyek Terhadap Kinerja Proyek Konstruksi,” Pros. Semin. Nas. Manaj. Teknol., 2015,
[14] D. M. Rachmania, “Analisis Penerapan Keselamatan Dan Kesehatan Kerja Pada Pembangunan Gedung DPRD Kabupaten Bangkalan,” 2021. [Online]. Available: http://repository.untag-sby.ac.id/8668/
[15] Sugiyono, Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Alfabeta Bandung, 2016.
[16] D. Ariani and B. M. Dwiyanto, “Analisis Pengaruh Supply Chain Management terhadap Kinerja Perusahaan (Studi Pada Industri Kecil dan Menengah Makanan Olahan Khas Padang Sumatera Barat),” Diponegoro J. Manag., vol. 2, no. 3, pp. 1–10, 2013, [Online]. Available: http://ejournal-s1.undip.ac.id/index.php/djom
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Potensi: Jurnal Sipil Politeknik

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
All papers published in Potensi: Jurnal Sipil Politeknik are under a CC-BY-SA or The Creative Commons Attribution-ShareAlike License.
All submitted papers must be original. Works that have been published are not under consideration for publication in other proceedings or scientific journals. Authors are responsible for obtaining all necessary permissions to reproduce tables, figures, and images. The paper must not contain defamation and must not violate any other rights of third parties.
Authors agree that the editorial board’s decision regarding the opportunity for paper presentation is final. Authors are prohibited from attempting to influence the technical team in efforts to have their paper published.
Before the final acceptance of the paper, authors are required to confirm in writing that they hold all copyrights to their paper and grant the publishing rights to Jurnal Potensi: Jurnal Sipil Politeknik.

