The Use of BIM Application for Schedule Planning and Real of Costs Estimation in Promenade Bridge Construction Project, Taman Mini Indonesia Indah

Authors

  • Ayisyah Herawati Politeknik Negeri Bandung
  • Bilfiana Nuranisa Politeknik Negeri Bandung
  • Risna Rismiana Sari Politeknik Negeri Bandung
  • Ery Radya Juarti Politeknik Negeri Bandung

DOI:

https://doi.org/10.35313/potensi.v27i2.5301

Abstract

Scheduling and cost estimation are essential for successful construction projects, including the revitalization of Taman Mini Indonesia Indah and the Promenade Bridge development. To improve efficiency and effectiveness, this study applies Building Information Modeling (BIM), using Tekla Structures 2022 for 3D modeling and Quantity Take-Off. The model provides detailed volume data, which—alongside daily and weekly reports—is used for cost analysis and scheduling. BIM integration enables better visualization, planning, and resource management throughout the project lifecycle. The result of the study shows that the total Real of cost estimation of Rp13.136.571.631,44 with the duration of work based on an analysis of daily reports and weekly reports for 155 working days starting on January 6th, 2021 until May 21st, 2021.  The use of Tekla Structures supports accurate modeling and work volume calculations, helping streamline budgeting and scheduling processes. The use of Building Information Modeling (BIM) in construction projects significantly accelerates the scheduling and cost estimation process even though certain limitations must be considered during project planning and execution.

Downloads

Download data is not yet available.

References

[1] X. Liu, J. Zhao, Y. Yu, and Y. Ji, “BIM-based multi-objective optimization of clash resolution: A NSGA-II approach,” J. Build. Eng., vol. 89, p. 109228, 2024.

[2] BIM PUPR, “Latar Belakang.” .

[3] J. Pantiga and A. Soekiman, “Kajian Implementasi Building Information Modelling (BIM) Di Dunia Konstruksi Indonesia,” Rekayasa Sipil, vol. 15, no. 2, pp. 104–110, 2022.

[4] Bina Marga, “Spesifikasi umum 2018,” Direktorat Jendral Bina Marga, vol. 2018, no. Revisi 3, pp. 1–6, 2018.

[5] Departemen Pekerjaan Umum Direktoral Jenderal Bina Marga, “Tata Cara Perencanaan Jembatan Penyeberangan untuk Pejalan Kaki di Perkotaan,” Departemen Pekerjaan Umum Direktoral Jenderal Bina Marga. p. 73, 1995.

[6] Pusat Litbang Jalan dan Jembatan, Pd 03 - 2017 - B Pedoman Perencanaan Teknis Fasilitas Pejalan Kaki. Kementerian PUPR, 2017.

[7] Direktorat Bina Program Jalan, Standar Jembatan Gelagar Komposit. Jakarta.

[8] Kementerian PUPR, Peraturan Menteri PUPR Nomor 1 Tahun 2022 Tentang Pedoman Penyusuanan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum dan Perumahan Rakyat. Kementerian PUPR, 2022.

[9] M. A. Enshassi, K. A. Al Hallaq, and B. A. Tayeh, “Limitation Factors of Building Information Modeling (BIM) Implementation,” Open Constr. Build. Technol. J., vol. 13, pp. 189–196, 2019.

Published

2025-10-14

How to Cite

Herawati, A., Nuranisa, B., Sari, R. R., & Juarti, E. R. (2025). The Use of BIM Application for Schedule Planning and Real of Costs Estimation in Promenade Bridge Construction Project, Taman Mini Indonesia Indah. Potensi: Jurnal Sipil Politeknik, 27(2), 72–78. https://doi.org/10.35313/potensi.v27i2.5301