Cost Efficiency Analysis in Special Structural Construction: A Case Study of the Nuclear Medicine Building Project
Keywords:
Construction management, Cost Efficiency, Unit Price Analysis, Implementation Budget Plan, Special StructureAbstract
Specialized healthcare infrastructure, such as Nuclear Medicine Buildings, demands highly accurate project budget planning due to structural complexities and technical standards. Discrepancies between the initial Owner’s Estimate (RAB) and real-market contractor implementation budgets (RAP) often lead to financial inefficiencies if not evaluated systematically. This study aims to analyze cost efficiency by directly comparing the Owner's Estimated Budget Plan (RAB) with the Implementation Budget Plan (RAP) derived from real-market price surveys, unit price analysis (AHSP), and resource productivity logic. Applied to the Nuclear Medicine Building Project at RSUD Dr. Soedarso in Pontianak, the research evaluates unit costs, work weight distributions, and overall monetary savings. The evaluation reveals that the total RAP amounts to IDR 8,756,988,074.05 compared to the initial RAB of IDR 12,215,041,500.12. This yields a significant cost variance efficiency saving of IDR 3,458,053,426.07 (a 28.31% savings rate). Structural works constituted the highest cost weight at 23.31% of the total project budget. The findings demonstrate that integrating real-market data into unit price analysis eliminates budgetary buffers, providing project managers with a rigorous cost control framework for complex medical facility developments.
Downloads
References
[1] W. I. Ervianto, Manajemen Proyek Konstruksi. Yogyakarta: Penerbit Andi, 2023.
[2] T. D. Rawis, T. Jermias, and T. T. Arsjad, "Perencanaan biaya keselamatan dan kesehatan kerja (k3) pada proyek konstruksi bangunan," Jurnal Sipil Statik, vol. 4, no. 4, pp. 45-52, 2016.
[3] R. Kustanto, K. Alexandernius, and R. S. Alifen, "Analisis produktivitas pekerjaan arsitektur proyek apartemen menggunakan metode time study," Jurnal Teknik Sipil, vol. 11, no. 1, pp. 64–70, 2022.
[4] Kementerian Pekerjaan Umum dan Perumahan Rakyat, Pedoman Analisis Harga Satuan Pekerjaan (AHSP) Bidang Pekerjaan Umum. Jakarta: Permen PUPR, 2021.
[5] I. Widiasanti, A. R. Musti, A. I. Rabitsani, B. Afriani, M. I. Ardiansyah, and N. Seftiani, "Pentingnya Implementasi Manajemen Waktu di Dunia Konstruksi," Jurnal Talenta Sipil, vol. 6, no. 2, pp. 236–242, 2023.
[6] S. Hadi, Manajemen Konstruksi (Proyek Jalan dan Jembatan). Banjarmasin: Poliban Press, 2020.
[7] E. Kusumo and F. F. Hakim, Buku Ajar Manajemen Konstruksi Penjadwalan Proyek Konstruksi Bagi Pemula Menggunakan Aplikasi ProjectLibre. Yogyakarta: Deepublish, 2023.
[8] M. Tanubrata and R. A. Trisyandi, "Evaluasi Pengadaan Bahan Konstruksi pada Proyek Rumah Sakit Unggul Karsa Medika," Jurnal Teknik Sipil, vol. 13, no. 2, pp. 133–159, 2019.
[9] G. Syahbani, H. Fadli, S. Utomo, and I. A. Reski, "Construction Management in Advanced Implementation of Indoor Stadium Building," Jurnal Manajemen Konstruksi, vol. 2, no. 2, pp. 112–120, 2022.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Potensi: Jurnal Sipil Politeknik

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
All papers published in Potensi: Jurnal Sipil Politeknik are under a CC-BY-SA or The Creative Commons Attribution-ShareAlike License.
All submitted papers must be original. Works that have been published are not under consideration for publication in other proceedings or scientific journals. Authors are responsible for obtaining all necessary permissions to reproduce tables, figures, and images. The paper must not contain defamation and must not violate any other rights of third parties.
Authors agree that the editorial board’s decision regarding the opportunity for paper presentation is final. Authors are prohibited from attempting to influence the technical team in efforts to have their paper published.
Before the final acceptance of the paper, authors are required to confirm in writing that they hold all copyrights to their paper and grant the publishing rights to Jurnal Potensi: Jurnal Sipil Politeknik.